formato1agn

Jardim do Tabaco Quay

Fases I e II

  • Program Description
  • Program Description

    Construction of a cruisers terminal with an overall extension of 675 m. The works to be executed in two phases comprise:

    • Rehabilitation of the existing quay.
    • Construction of a new structure (made of armed concrete cast in situ piles (Ø=1,00 m) and armed concrete slab) with a width of 45 m in order to reach the deeper operation depths necessary for the large cruisers.
    • Improvement of the soils geotechnical characteristics by using geo-textiles.
    • Construction of a rock fill protection prism in the face of the quay.
    • Reconstruction of the rock fill and filter in the back of the quay, in order to avoid the settlements of the earth fill.
    • Utilities infrastructures.

    In the second phase, the work took place in a front of 475 m, and in addition to the execution of reinforcement and enlargement of the existing pier, was awarded the landfill Dock Terreiro do Trigo.

  • Assignment
  • Assignment

    Supervision of construction works

    Quality assurance

    Safety coordination

  • general data
  • Work’s Value
    50 Million €
  • Dates
    from 2007to 2011
  • Site
    Lisboa
  • Country
    Portugal
  • Client
    Administração do Porto de Lisboa
  • Companies
    TPF Consultores
    IPERPLANO
  • Images
  • Image 4
    jardimtabaco2-planege
  • Image 3
    apl_2-fase_2a
  • Image 2
    jardimtabaco4-planege